Skip to main content
Cheltenham, Gloucester and Tewkesbury Strategic and Local Plan Home

Download the Settlement Hierarchy Topic Paper and provide general comments

The Settlement Hierarchy Topic Paper can be downloaded using the link below. The 'share your thoughts' button will allow you to leave general comments on the paper.

You're viewing real-time data. Participant counts are continuously updated for administrators. Please note that regular users see cached data, which may result in slight differences in the numbers.
71 participants

Phases

Phases overview
Phase 1: Download and comment on the Settlement Hierarchy Topic Paper
Download and comment on the Settlement Hierarchy Topic Paper
Phase 2: Reviewing your comments and responses
Reviewing your comments and responses

Feeding back

16 March 2026 00:00 - No end date

The Regulation 18 Statement of Consultation and Engagement has now been published and is available to view here: SLP Regulation 18 Statement of Consultation and Engagement

Below is a summary of the feedback you provided on the Settlement Hierarchy Topic Paper:

Consultation responses mainly focussed on concerns relating to Apperley, with a strong and consistent view that it should not be classified as a Service Village. Respondents argued that the designation does not reflect local circumstances, citing the village's limited facilities, poor accessibility and infrastructure constraints.

A recurring theme was the lack of essential services within Apperley. Respondents highlighted the absence of facilities such as shops, healthcare provision, pharmacies and other day-to-day services, meaning residents are heavily reliant on travelling elsewhere to meet basic needs.

Transport and accessibility concerns featured prominently. Many respondents described bus services as infrequent and poorly timed, while roads were characterised as narrow, congested and often unsuitable for increased traffic. A lack of pavements, safe walking routes and cycling infrastructure was repeatedly identified, reinforcing concerns about car dependency.

Infrastructure capacity was another major issue. Respondents raised concerns regarding low water pressure, electricity supply constraints, drainage and sewerage capacity, broadband limitations and occasional power outages. Many considered existing infrastructure insufficient to accommodate significant additional growth.

Flood risk emerged as one of the strongest themes throughout the consultation. Respondents argued that parts of Apperley and several proposed development sites are affected by fluvial and surface water flooding. Concerns were raised about roads becoming impassable during flood events, the risk of settlements being isolated, and the potential for new development to worsen drainage and runoff issues.

Education provision was also cited as a constraint, with many respondents stating that the local primary school is already at or near capacity. More broadly, concerns were raised about pressure on health services and other community facilities should further housing be accommodated without supporting investment.

Many responses specifically objected to the proposed HELAA sites around Apperley. Concerns focused on flood risk, poor access arrangements, increased traffic, loss of agricultural land and green space, and potential harm to the village's rural character and identity.

Across a large number of responses there was support for only limited, infrastructure-led growth. Respondents generally accepted that small-scale development meeting local needs may be appropriate, but argued that significant growth should not occur unless roads, utilities, drainage, schools and other services are improved first.

Comments relating to Churchdown focused on both settlement classification and development pressures. A number of respondents argued that Churchdown has been incorrectly classified as an urban fringe settlement, suggesting instead that it should continue to be recognised as a distinct village, or alongside Innsworth as a small town.

There were also repeated concerns about the capacity of Churchdown to accommodate further development. Respondents cited existing pressures on roads, schools, healthcare services, water and sewerage infrastructure, arguing that previous growth has already stretched local facilities.

The protection of Green Belt land was a significant issue, particularly around Churchdown and Parton Farm. Respondents emphasised the importance of maintaining the separation between settlements, preventing coalescence with Gloucester, and retaining open countryside, biodiversity and landscape character.

More broadly, many respondents objected to development on greenfield and Green Belt land, raising concerns about the loss of wildlife habitats, biodiversity impacts, climate change resilience and the gradual erosion of village identity and character.

A further theme related to the quality and accuracy of the evidence base. Numerous respondents questioned whether settlement classifications were supported by robust evidence, with particular concerns that population figures and service data for Churchdown and Innsworth may be inaccurate. Some suggested these errors undermine confidence in the methodology and overall findings.

Several responses also called for improvements to the settlement hierarchy methodology itself. While some respondents supported the principle of reviewing and refining the hierarchy, others felt it had become overly complex, lacked transparency in places and needed stronger justification, particularly regarding accessibility assumptions and distinctions between settlement tiers.

Overall, respondents commonly argued that future growth should be directed towards the most sustainable locations and be accompanied by timely infrastructure investment. There was broad support for a planning approach that balances development needs with infrastructure capacity, environmental protection, settlement character and community wellbeing.